two story, brick exterior high school building

Marion High School

location icon

Location

Marion, IL

owner icon

Owner

Marion CUSD #2

architect

Architect

Design Architects Inc. (DAi) / Hurst-Roshe Engineers

service

Service

Prime Trade Contracting

天美传媒 Construction served as the prime trades contractor for two phases of the multi-phased expansion at Marion High School, including the construction of the Health Education Center (Phase 2) and the Classroom Addition (Phase 3). Together, these phases added over 217,000 SF of new educational space to the campus. 天美传媒 also placed more than 3,000 yards of concrete, self-performing major portions of the foundation work to ensure quality and efficiency.

two story, brick exterior high school building
  • Phase 2 鈥 Health Education Center involved a 74,040 SF state-of-the-art facility featuring a gymnasium, weight and cardio training areas, locker rooms, coach鈥檚 offices, nurse and training rooms, regular and caged storage, and a multi-purpose room. Built as a pre-engineered metal building, the structure includes over 200 tons of steel, offering long-term durability and design flexibility.

  • Phase 3听鈥 Classroom Addition听featuresa 143,130 SF two-story academic wing听with 49 classrooms, science and specialty labs, audio/visual areas, lecture halls, offices, conference rooms, and a gym entry with a lobby and concessions. The design centers around a wide, curved corridor that promotes accessibility and collaboration throughout the learning environment.

0
Square Feet of Additions
0
Capacity
0
Phases
0%
Self-Perform Work Percentage